Browse Cases

Showing 1-2 of 2 results

Native American and environmentalist groups block nuclear waste site in Ward Valley, California, 1995-2000

Country
United States
Time period
10 October, 1995 to November, 2000
Classification
Defense
Cluster
Environment
Human Rights
National/Ethnic Identity
Total points
10 out of 10 points
Name of researcher, and date dd/mm/yyyy
Fatimah Hameed 10/02/2013

In March of 1988, U.S. Ecology, a national dump operating company, decided upon Ward Valley, California as the most desired location for building a new nuclear waste dump. Because this was federal land in the state, the government of California needed to buy Ward Valley land from the Bureau of Land Management in order to give U.S. Ecology the rights to build the dump. The Valley, however, is located in the Mojave Desert, an area home to an endangered species of desert tortoise considered sacred to a number of Native American tribes.

Basque citizens end construction of Lemoniz Nuclear Power Plant, 1976-1978

Country
Spain
Time period
May, 1976 to March, 1978
Classification
Defense
Cluster
Environment
Total points
6.5 out of 10 points
Name of researcher, and date dd/mm/yyyy
Nancy Liu, 25/09/2011

The construction of the Lemoniz Nuclear Power Plant started in the 1970s, as the power company Iberduero Basque Utility planned to build several nuclear plants on the Basque coast. There had been an international oil crisis during the time, and the effect of the oil shortage had huge detrimental consequences for the Spanish economy. The central government was interested in investing in alternative energy such as nuclear power. The central planning of the Lemoniz power plant began in 1972 when the government gave provisional approval to build a nuclear power plant in Lemoniz.